Project Description
Turn Key Floors was trusted to modernize the flooring in an active Winn-Dixie location—without disrupting daily operations. This high-stakes project required precision planning, environmental controls, and flawless execution.
Project Details
Copyright:
Turn Key Floors
We began with the removal of the existing flooring, followed by concrete grinding and a full moisture mitigation system to ensure long-term durability. A self-leveling underlayment created a perfectly smooth base for the installation of resilient flooring throughout the store.
To protect customers and staff, our team deployed full enclosure containment systems with commercial-grade air scrubbers, maintaining clean air and safe conditions from start to finish. The store remained fully operational, and the transformation was completed with minimal disruption and maximum efficiency.


